“Short payback period thanks to significantly increased line efficiency”
“Short payback period thanks to significantly increased line efficiency”
Summary
Customer: Danone Nutricia
Country: The Netherlands
Products: 10 cl PEHD bottles
Sector: dairy
Speed: 25.000 bottles per hour
Number of motors: 10
Type opdracht: adaption/upgrade of existing line
Customer’s challenge
One of the existing lines was not operating to maximum efficiency. The essence of the problem was poor interaction between the machines and conveyors in the middle of the line.
Solution
Significantly increased line efficiency
One of the pain points was a high incidence of start/stop situations. Adapted programming now ensures much better interaction between the machines.
Far fewer start/stops
Since the line balance was not optimal, we examined a better mix of buffering ability and speed. This resulted in much higher Overall Equipment Efficiency (OEE).
Short payback period
The investment in the line adaptation was fully recouped within only six months.
In the words of the customer